![]() ![]() ![]() Connection to place, adaptability, connectivity of space and durable materials ensure the facility will remain a strong civic symbol.” Scope: education specifications, programming, master planning, design and phased construction. Organized to foster student safety, security and inclusion, the light-filled core classroom spaces are arranged around shared learning spaces. “This new 100,400 SF elementary school replaces a mid-century campus and can accommodate up to 729 students.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |